Use app×
Join Bloom Tuition
One on One Online Tuition
JEE MAIN 2025 Foundation Course
NEET 2025 Foundation Course
CLASS 12 FOUNDATION COURSE
CLASS 10 FOUNDATION COURSE
CLASS 9 FOUNDATION COURSE
CLASS 8 FOUNDATION COURSE
0 votes
72 views
in General by (120k points)
closed by
Which of the following determines the required transmission power in MLS?

(a) Noise

(b) Bit error rate

(c) Runway length

(d) Aircraft size

1 Answer

0 votes
by (120k points)
selected by
 
Best answer
Right answer is (b) Bit error rate

To explain: The acceptable bit error rate of the differential phase shift keying (DPSK) transmissions at the 20-nmi limit determines the transmitter power needed in the ground stations.

Related questions

0 votes
1 answer
0 votes
1 answer
0 votes
1 answer
0 votes
1 answer

Welcome to Sarthaks eConnect: A unique platform where students can interact with teachers/experts/students to get solutions to their queries. Students (upto class 10+2) preparing for All Government Exams, CBSE Board Exam, ICSE Board Exam, State Board Exam, JEE (Mains+Advance) and NEET can ask questions from any subject and get quick answers by subject teachers/ experts/mentors/students.

Categories

...